< Next | St Helens Canal | Next > | |||
< Earlestown | Warrington > |
A modern swing bridge replaces the former swing bridge across Bewsey Lock. This is ready to swing once the vegetation is cleared and the lock is restored. It will have to be opened while the lock is in use, which means the main path of the Sankey Canal Trail which crosses the bridge will be interrupted for 10-15 minutes at a time.
Waterway and Kilometerage | HELENS 10.630.02 |
OS Grid Reference | SJ 59284 89662 |
Date and Time | 151229 130327 |
Copyright © | Paul Balmer |
Recent Comments