< Next | St Helens Canal | Next > | |||
< Warrington | Widnes > |
Continuing beyond the two fixed rail and road bridges the next bridge is a footbridge with navigation clearance across a channel that looks ready for boats already.
Although not following the canal as close as a normal towpath, the footpath or cycle path generally follows the line of the the canal.
Waterway and Kilometerage | HELENS 08.645 |
OS Grid Reference | SJ 58761 87863 |
Date and Time | 151229 123537 |
Copyright © | Paul Balmer |
Recent Comments