< Next | Boardman’s Bridge Branch | Next > | |||
< Ravenhead Branch Jn | New Double Locks Jn > |
With canal restoration seriously proposed it’s a little surprising that a recently installed footbridge has been constructed with such limited clearance, especially as there aren’t any obvious reasons why it couldn’t have been constructed with navigation clearances.
Waterway and Kilometerage | HELENS-BBB 24.580.01 |
OS Grid Reference | SJ 51412 94933 |
Date and Time | 160114 132601 |
Copyright © | Paul Balmer |
Recent Comments