< Next | Boardman’s Bridge Branch | Next > | |||
< Ravenhead Branch Jn | New Double Locks Jn > |
The line of the canal is still available for restoration where this hasn’t already been been done. Here the route passses through the grass and through the vacant arch of Corporation Street Bridge. The towpath is walkable, the other side of the fence and passing through the next arch.
Waterway and Kilometerage | HELENS-BBB 24.075 |
OS Grid Reference | SJ 51693 95332 |
Date and Time | 160114 124656 |
Copyright © | Paul Balmer |
Recent Comments