Home            
Home
Home
Start of Content

Home


     

      RSS Feed
 

  Recent Comments   

  • > Tony:  363 sites, only 153 active though. I’ve blocked a lot sites that were either junk entries,...
  • > Sue:  A great tribute to Tony’s work Paul. 363 sites is amazing, I had no idea. My logo is someway...
  • > Jo:  Was lovely to see you. Hope to see you again soon. Have a wonderful Christmas and all the very best...
  • > Paul from Waterway Routes (DVDs and Maps):  Martin: I don’t know why, but I’d always beleieved...
  • > Martin Clark:  Thanks for the mention of Pennine Waterways. You say “Describing themselves...
  • > Mike George:  Thanks for the mention of On The Ashby. We get a steady trickle of visits from UKWRS and...



New Products

Warwickshire Ring (Combined)

Warwickshire Ring (Combined)

£19.90

Your opportunity to save a little money with both the Popular and Bowcam DVDs together in one box at a lower price, and you save on postage too.
find out more

Caldon Canal (Combined)

Caldon Canal (Combined)

£14.90

Your opportunity to save a little money with both the Popular and Bowcam DVDs together in one box at a lower price, and you save on postage too.

find out more



Oxford Canal’s new Bridge 189

«

»

Bridge 189 on the Oxford Canal has been missing for several years, awaiting repairs. The abutments have recently been repaired and today was the day for lifting the new bridge into place.

The crowds gathered from the waiting boats - note the pampered pooch sitting on its owners chair.

The crane arrived and lifted the deck into place first and the fit was checked. It was lifted out again for minor adjustment, then replaced.

2

3

4

Aligning the teeth at the pivot was a little tricky but lots of hands soon made light work of the task and the platform was in place and correctly aligned.

The first of the balance beams was lifted into place and large bolts used to fasten it there.

The workboat was used as a working platform to access the bolts underneath to make sure they were tight.

Suddenly it was starting to look like a proper bridge.

6

7

8

Then the second was lifted into place and bolted into position and it was time to test the balance.

The beams had deliberately been manufactured a little too long and the chainsaw was used to make the final adjustments.

The press were getting bored by then so two proud craftsmen who had made the bridge stood for photos and answered their questions. They fitted the handrails and finished their work after a short lunch break.

10

11

12

We talk about "hanging" lock gates but what’s the correct term for fitting a bridge? Any suggestions?

Posted on Thursday, 19 August 2010 at 22:02        Comments (0) 

 

No Comments »

No comments yet.

Leave a comment

Category(s): Oxford





 
 
 


  Blog Archives   

  • 2012 (17)
  • 2011 (43)
  • 2010 (79)
  • 2009 (70)
  • 2008 (57)
  • 2007 (76)
  • 2006 (53)

  Blog Categories   

   Best Sellers   

Warwickshire Ring (Combined)

Warwickshire Ring (Combined)

£19.90

Your opportunity to save a little money with both the Popular and Bowcam DVDs together in one box at a lower price, and you save on postage too.
find out more

Llangollen Canal (Combined)

Llangollen Canal (Combined)

£19.90

Your opportunity to save a little money with both the Popular and Bowcam DVDs together in one box at a lower price, and you save on postage too.

find out more

Warwickshire Ring (Popular)

Warwickshire Ring (Popular)

£12.95

The highlights of a cruise, like a television programme, showing the Warwickshire Ring.


find out more

Birmingham Canal Navigations (Combined)

Birmingham Canal Navigations (Combined)

£19.90

Your opportunity to save a little money with both the Popular and Bowcam DVDs together in one box at a lower price, and you save on postage too.

find out more

spacer
End of Content